This is a grievance mechanism a borrower can adopt before its first complaint: a one-page procedure, response tiers, a log with 17 fields and a short public notice. It is built on IFC Performance Standard 1, EBRD's ESR 10 and its grievance briefing note, so a lender's E&S review can test it line by line.

Who uses it: owners and E&S leads of SMEs and project companies whose loan carries an E&S action plan; E&S officers at banks and non-bank lenders who check that borrowers run a mechanism; and anyone writing the complaints element of an ESMS.

On this page
  1. Why write it now
  2. What the standards ask
  3. Part 1. The procedure, on one page
  4. Part 2. Response tiers
  5. Part 3. The log: 17 fields
  6. Part 4. The monthly summary
  7. Part 5. Public notice (short form)
  8. A fictional six-entry log
  9. What the lender checks
  10. Rules
  11. Sources
  12. Cite this page
  13. Related pages
  14. Glossary terms on this page

Send me what you received

Why write it now

A grievance mechanism is written in one of two moments: before the first complaint or after it. After it, the clock has already started and nobody owns it. The requirement is in four public places, and the wording is close enough to design from once.

What the standards ask

SourceWhat it requiresNumbers
IFC Performance Standard 1, 2012, paras 34 to 36A procedure to receive, register, screen and answer external communications (para 34). Where there are Affected Communities, a mechanism scaled to the risks, accessible, "at no cost and without retribution", which must not impede judicial or administrative remedies (para 35). Periodic reporting back (para 36)3 paragraphs
EBRD ESR 10, 2024 policy (in force 1 Jan 2025), paras 34 to 37An effective mechanism "as early as possible", proportionate, anonymous complaints allowed, dedicated channels for gender-based violence and retaliation, an appeals step, monitoring and trend analysis7 days to acknowledge and 30 days to propose a resolution, as indicative time frames in EBRD's briefing note
CBE ESRMS guide, section I, element 6, circular of 30 June 2026 (unofficial English translation, paraphrased)The lender ensures the client has appropriate mechanisms to handle complaints from interested parties, and appropriate means of communication with them1 of 11 elements
UN Guiding Principles, Principle 31Non-judicial mechanisms should be legitimate, accessible, predictable, equitable, transparent, rights-compatible, a source of continuous learning, and based on engagement and dialogue8 criteria

IFC also runs three levels for its own projects: the client's project-level mechanism, IFC's institutional mechanism, and the CAO as its independent accountability mechanism. Using one does not close the others. A borrower's mechanism is the first door, not the only one.

Part 1. The procedure, on one page

Fill the brackets. Keep it to one page so staff can follow it.

  1. Purpose. [Company] receives and answers concerns about its environmental, social, health and safety performance from neighbours, workers of contractors, customers and anyone else affected. Workers have a separate workplace channel.
  2. Channels. In person at [site office], by phone on [number], by email to [address], by post to [address], through a web form or a locked box at [location], or through a third party the complainant chooses. All channels are at no cost to the complainant.
  3. Anonymity and confidentiality. Anyone may complain anonymously. Anyone may ask that their name is withheld. Personal data is seen only by the case owner.
  4. No retaliation. [Company] does not penalise anyone for raising a concern. A report of retaliation is treated as critical.
  5. Steps. (1) Receive and record in the log. (2) Assess severity, set the tier and assign an owner. (3) Acknowledge in writing. (4) Investigate. (5) Propose a resolution in writing. (6) If the complainant is not satisfied, review by [senior manager not involved in the case]. (7) Close and implement, and record why.
  6. Time frames. Set by tier (Part 2). The clock starts on the day any staff member receives the concern, by any channel.
  7. Other remedies. Using this mechanism does not stop anyone going to a court, a regulator or a lender's own complaints channel.
  8. Owner and reporting. [Role] owns the mechanism. [Senior manager] reviews a monthly summary. The summary goes to the lender with the annual E&S report, or sooner if the loan agreement says so.

Part 2. Response tiers

EBRD's indicative time frames fit most complaints. They do not fit a safety threat or a report of retaliation. The tiers below are my design, built on those two figures. The Tier 1 and Tier 3 targets are design choices, not published standards.

TierWhat qualifiesAcknowledgeProposed resolution
1 CriticalSafety, retaliation, gender-based violence and harassment, threats, child safeguardingSame working dayWritten plan in 7 days
2 StandardSpecific complaint about the borrower's activity7 days30 days
3 ComplexNeeds a site visit, an expert or an outside party's input7 daysWritten update at day 30, then every 30 days
QueryRequest for information, not a complaint5 working daysLog and answer

EBRD's note lists harassment, threats, physical violence, security incidents, gender-based violence and harassment, retaliation, accidents and potential community conflict among grievances of a critical nature. It says these should go to senior management as soon as possible, with the investigation led by a relevant senior manager.

Anonymous cases. They get the same clock for investigation. EBRD notes the practical limit: an anonymous complaint cannot be acknowledged or followed up unless a proxy or third-party channel allows it. Log the date anyway, and record the resolution even if nobody can be told.

Part 3. The log: 17 fields

One row per case. Queries get a row too, so the log shows what is not a grievance. A spreadsheet is enough.

#FieldWhat goes in it
1Case numberG-001, sequential, never reused
2Date receivedThe day any staff member received it
3ChannelIn person, phone, email, post, web form, box, third party
4Received byRole, not name
5ComplainantName, or "anonymous", or "withheld at request"
6Site or unitWhich site, line or contractor the concern relates to
7Location of complainantTown or district
8DescriptionTwo sentences, in the complainant's words
9CategoryEnvironment, labour (contractor), community, land, conduct, query
10Tier1, 2, 3 or Query, set at intake
11Retaliation or safety flagYes or no; yes triggers Tier 1
12OwnerOne named role
13Escalated toSenior manager and date (Tier 1); lender, if the loan agreement requires notice
14Date acknowledgedGives days to acknowledge, against the tier target
15Proposed resolution and dateGives days to resolve, against the tier target
16Complainant satisfiedYes, no, no reply
17Appeal and closureAppeal date and outcome; closing date and reason

The columns follow the sample register in EBRD's briefing note (Annex 3), with the tier, the retaliation flag and the escalation date added.

Part 4. The monthly summary

EBRD's note suggests monthly monitoring for most projects. One page:

IndicatorThis monthLast month
Opened, under investigation, resolved, in appeal, closed
Acknowledged on time (%)
Resolution proposed on time (%)
Median days to acknowledge
By category
Anonymous cases (number, type, location)
Repeat locations or repeat contractors
Tier 1 cases and what was done

Remove personal data from anything shared beyond the case owner. A rise in anonymous complaints is a signal in itself: EBRD suggests checking whether people doubt that complaints are handled in confidence.

Part 5. Public notice (short form)

Post it at the site gate, on the website and in the local language.

Have a concern about our site? Tell us in person at [office], by phone on [number], by email to [address], or in the box at [location]. You can stay anonymous. It costs you nothing. We will reply within 7 days and propose a solution within 30 days, or sooner if it is about safety. Nobody will be penalised for raising a concern. You can still go to the authorities or a court at any time.

A fictional six-entry log

All dates are invented. As at 30 April of a fictional year: five grievances and one query.

CaseReceivedChannelTierAcknowledgedProposed resolutionResult
G-0012 MarEmail25 Mar (3 days)26 Mar (24 days)Satisfied, closed 30 Mar
G-0029 MarPhone211 Mar (2 days)17 Apr (39 days)Not satisfied, appeal lodged 24 Apr
G-00316 MarWeb form, anonymous116 Mar (0 days)Plan 23 Mar (7 days)Closed 6 Apr, retaliation flag
G-00430 MarIn person21 Apr (2 days)28 Apr (29 days)Satisfied, closed 30 Apr
G-0056 AprEmailQuery7 Aprn/aAnswered and closed
G-00613 AprPost223 Apr (10 days)Due 13 MayOpen, day 17 of 30

Four of five acknowledged on time (80%). Three of four due resolutions proposed on time (75%). Median time to acknowledge: 2 days. One of four resolved grievances went to appeal (25%).

Read the pattern, not the average. G-006 came by post and was acknowledged on day 10; the four that came by email, phone, web form or in person were acknowledged within 3 days. The fix is to open the post daily and log it the same day. G-002 missed because it needed an outside party's input: a Tier 3 case logged as Tier 2. The fix is a tiering rule at intake, not a faster officer.

What the lender checks

A lender's review of this mechanism asks five things. Keep the answer to each on file.

CheckEvidence
Does a written procedure exist, with an owner?Part 1, signed and dated
Do people know about it?Photo of the notice; web page; date posted
Is every concern logged, including queries?The log, with no gaps in case numbers
Are the time frames met?Monthly summary, on-time rates
Does senior management see it?Review record; Tier 1 escalations

The lender also needs its own channel. A borrower may have no mechanism, a complainant may not trust the borrower's, and a lender that never sees complaints cannot read the pattern across its book. EBRD's ESR 9 says an intermediary assumes delegated responsibility for E&S risk management and monitoring, and complaint trends are monitoring data. The lender's channel receives, refers, tracks and counts. It does not replace the borrower's duty, and it does not investigate site facts the lender cannot see.

Rules

  1. Tier at intake. Re-tier only with a written reason.
  2. Log every complaint, even if it looks trivial or unfounded.
  3. Anonymous complaints get the same investigation clock.
  4. A Tier 1 case reaches the senior manager who oversees the mechanism the same day.
  5. Report monthly: counts by status, on-time rates, categories, anonymous share and repeat locations.
  6. Remove personal data from anything shared beyond the owner.

Sources

  1. IFC, Performance Standard 1, 1 January 2012, paras 34 to 36 ifc.org
  2. IFC, Responding to Environmental and Social Complaints, December 2023 ifc.org
  3. EBRD, Environmental and Social Policy, October 2024 (in force 1 January 2025), ESR 10 paras 34 to 37 and ESR 9 ebrd.com
  4. EBRD, Project Grievance Mechanism: Briefing Note (time frames, critical grievances, anonymous grievances, monitoring, Annexes 2 and 3) ebrd.com
  5. CBE circular on the implementation of ESRMS, 30 June 2026, unofficial English translation, Sustainable Banking and Finance Network data.sbfnetwork.org
  6. UN OHCHR, Guiding Principles on Business and Human Rights, 2011, Principle 31 ohchr.org

All views are my own, written in a personal capacity. They do not represent my employer or any other institution. This template explains published standards; it is not legal advice, and your loan agreement prevails.

Cite this page

Hamdy, O. (2026) "Grievance mechanism template for borrowers: 17-field log". omarhamdy.com, 2 November 2026. https://omarhamdy.com/toolkit/grievance-mechanism-template/

Related pages

Glossary terms on this page

Condition Precedent ends every issue with a working tool like this one. The full piece behind this page is “Write the grievance mechanism before you need it”.