CBAM for Egyptian cement and clinker: the defaults, the clinker ratio, and why tonnes matter more than euros

Cement is Egypt's smallest CBAM group by worth, EUR 90.2m in 2025, but the second largest by weight: 1.65 million tonnes, most of it clinker. Because cement is cheap per tonne and carbon-heavy, the CBAM cost per euro of sales is higher than for any other Egyptian line. This page applies the CBAM hub for Egyptian exporters to clinker and cement.

Run the CBAM readiness checkCompany bankability review

What counts as cement under CBAM

Annex I of Regulation (EU) 2023/956 covers heading 2523 (cement and clinker) and calcined kaolinic clay (2507 00 80). The default and the benchmark depend on whether the product is grey or white, and whether it is clinker or finished cement.

CN or TARIC codeWhat it coversEgypt default, total (tCO2e per tonne)Direct / indirectCBAM benchmark, Column B / Column ADefault for countries without their own entry
2523 10 00 90Grey clinker and other clinker1.2701.240 / 0.0300.666 / 0.6661.410
2523 10 00 10White clinker1.3301.290 / 0.0400.859 / 0.8591.370
2523 29 00Grey Portland cement1.2901.240 / 0.0500.666 / 0 plus clinker1.440
2523 21 00White Portland cement1.3901.250 / 0.1300.859 / 0 plus white clinker1.450
2523 90 00 90Other hydraulic cements, grey1.2401.180 / 0.0600.666 / 0 plus clinker1.370

Sources: defaults, Implementing Regulation (EU) 2025/2621, Annex I, tables "Egypt" and "Other countries and territories", as replaced by (EU) 2026/1740, read from the Commission's Excel transcription of 6 August 2026 (the regulation is the binding text). Benchmarks, Implementing Regulation (EU) 2025/2620, Annex, Commission Excel of 6 February 2026. Direct and indirect figures may not add to the total because of rounding.

Column A is zero for finished cement. On actual data, the deduction for cement comes only from the clinker in it: the clinker benchmark times your clinker ratio. On the default, the full 0.666 applies. This is why the clinker ratio is the single most important number in an Egyptian cement exporter's CBAM file.

Where the country of production of clinker used in cement cannot be identified, Annex IV of 2025/2621 (as replaced) applies 1.440 tCO2e per tonne of grey clinker.

EU imports of cement and clinker from Egypt

YearAll of 2523, EUR mAll of 2523, tonnesClinker (2523 10), tonnesWhite Portland (2523 21), tonnesGrey Portland (2523 29), tonnes
202338.1461,120307,871152,2211,028
202472.01,222,8061,040,645163,63418,521
202590.21,646,8431,350,005155,662141,148

In 2025, Egypt supplied 18.9% of the clinker, 21.5% of the white Portland cement and 2.4% of the grey Portland cement the EU imported from outside the EU, by tonnes.

Source: Eurostat Comext, dataset DS-045409, reporter EU, partners Egypt and extra-EU, imports, CN 2523 and its eight-digit lines, annual, dataset version of 16 October 2026, queried 2 November 2026. Shares are my division of Egypt's tonnes by extra-EU tonnes (7,147,931 for clinker, 724,021 for white and 5,765,759 for grey Portland cement in 2025). Comext reports clinker at eight digits, so white and grey clinker cannot be separated in this data.

Clinker sales to the EU more than quadrupled between 2023 and 2025. In euros it is a small trade, EUR 58.4m in 2025, about EUR 43 a tonne on my division. The CBAM cost on a tonne of clinker can be a large share of that price, which is why cement is the line where CBAM weighs most on price.

The default and the mark-up, year by year

Import yearMark-upCBAM factorGrey clinker: default usedGrey clinker: certificates per tonneGrey cement: default usedGrey cement: certificates per tonne
202610%97.5%1.3970.7481.4190.770
202720%95%1.5240.8911.5480.915
202830%90%1.6511.0521.6771.078
203030%51.5%1.6511.3081.6771.334
203430%none1.6511.6511.6771.677

Sources: mark-ups, Implementing Regulation (EU) 2025/2621, Annex I, opening paragraphs, as replaced by (EU) 2026/1740; CBAM factor, Directive 2003/87/EC, Article 10a(1a); benchmark 0.666 (Column B) from 2025/2620. The cross-sectoral correction factor is taken as 1, its maximum. Egypt has no carbon price, so nothing is deducted for carbon paid at home.

For the whole flow, as an illustration. If the 1,350,005 tonnes of clinker of 2025 entered again, all on the Egyptian grey clinker default, importers would owe about 1.01 million certificates in 2026, 1.42 million in 2028 and 2.23 million from 2034: about two thirds of what the whole urea trade needs in 2026, on a trade worth about a twentieth as much. This is my arithmetic, taking all the clinker as grey, not a forecast.

Worked example and calculator

The plant is fictional and the "actual" figures are assumptions chosen to show the arithmetic, not a benchmark for any real Egyptian plant. P is the certificate price in euros per tonne of CO2e, from the Commission's "Price of CBAM certificates" page.

Inputs (illustrative): 10,000 tonnes of grey Portland cement, CN 2523 29 00, produced and imported in 2027. Verified embedded emissions, direct plus indirect and including the clinker, 0.800 tCO2e per tonne of cement (assumed). Clinker ratio 0.85 tonnes of clinker per tonne of cement (assumed).

  1. Embedded emissions. Default: 10,000 x 1.290 x 1.20 = 15,480 tCO2e. Actual: 10,000 x 0.800 = 8,000 tCO2e.
  2. Deduction. Default: 10,000 x 0.666 x 0.95 = 6,327 tCO2e. Actual: 10,000 x (0 + 0.85 x 0.666) x 0.95 = 5,378 tCO2e.
  3. Certificates. Default: 9,153. Actual: 2,622.
  4. Cost. Default: 9,153 x P. Actual: 2,622 x P. The gap is 6,531 x P: every EUR 1 of certificate price adds about EUR 0.65 per tonne of cement to the cost of staying on the default.

The break-even. With a clinker ratio of 0.85, actual data is cheaper for grey cement when the verified figure is below about 1.322 tCO2e per tonne in 2026, 1.453 in 2027 and 1.587 in 2028. For grey clinker the deduction is the same on both bases, so the line is simply the default with its mark-up: 1.397, 1.524 and 1.651. A lower clinker ratio lowers the actual figure but also the actual deduction; the calculator shows the net effect.

Work it out: certificates and cost

Type the current figure from the Commission's page. This site states no price.

Direct plus indirect where they count. Leave empty to see the default only.

Illustrative arithmetic on public figures, not advice for a shipment. Cross-sectoral correction factor taken as 1, its maximum; a lower factor shrinks the deduction. No carbon price paid in Egypt is deducted.

Defaults: Implementing Regulation (EU) 2025/2621 as replaced by 2026/1740. Benchmarks: 2025/2620. CBAM factor: Directive 2003/87/EC, Article 10a(1a).

The calculator runs in your browser and sends nothing. For finished cement, type your clinker ratio to see the actual-data result. Certificates equal embedded emissions minus the benchmark times the CBAM factor, never below zero.

What your EU importer and the verifier will ask for

  • The CN or TARIC line, shipment by shipment, matched to the customs declaration: grey or white, clinker or cement.
  • Installation identity: operator, address, coordinates and main activity, the fields used to register an installation in the EU CBAM registry (Article 10 of Regulation (EU) 2023/956). A grinding plant that buys clinker is a separate installation from the kiln that made it.
  • Direct emissions per tonne of clinker, for the reporting period, calculated under Implementing Regulation (EU) 2025/2547: process emissions from calcining limestone and combustion emissions from kiln fuels, with the share of alternative fuels and biomass.
  • Indirect emissions: the power used per tonne of clinker and of cement and the emission factor applied. Default factors for indirect emissions are in Annex II of Implementing Regulation (EU) 2025/2621.
  • The clinker ratio of each cement type, with production records behind it, and where the clinker was made.
  • A verification report from an accredited verifier, if the importer is to declare on actual data (Article 8 and Annex VI).
  • A named contact and a date for next year's update.

The lender's view

Cement has the steepest CBAM cost per euro of sales. At about EUR 43 a tonne of clinker on the 2025 trade figures and about 0.75 certificates a tonne on the default in 2026, the certificate cost can be a large share of the selling price. A lender to an exporting cement plant should read EU sales as the most exposed part of the book and test them at several certificate prices.

What a lender wants to see before counting a CBAM benefit in a decarbonisation loan:

  • A verified baseline per tonne of clinker and of each cement type, direct and indirect. A cut in emissions at a plant that stays on defaults changes nothing on the bill.
  • The lever, measured. Most of a cement plant's emissions come from limestone and kiln fuel. Alternative fuels and waste-derived fuels, kiln and cooler efficiency, and a lower clinker ratio through supplementary materials move the figure. Waste heat recovery and renewable power reduce indirect emissions, which count for cement.
  • The clinker ratio effect calculated both ways. A lower ratio reduces embedded emissions and the actual-data deduction together. The calculator shows the net.
  • Who captures the saving. The importer buys the certificates. On a low-priced product a pricing clause that shares the saving may decide whether the trade survives.
  • The result at several certificate prices and for 2026 to 2028, as the mark-up rises to 30%.

Next steps

  1. Confirm the CN or TARIC line of every product you ship to the EU: grey or white, clinker or cement.
  2. Run the calculator for 2026, 2027 and 2028 at three prices from the Commission's page, using your own clinker ratio.
  3. Ask each EU buyer which basis they will declare on and when they need your data.
  4. If your kiln and grinding data are already metered, scope verification before 2028.
  5. Read the CBAM hub for Egyptian exporters for the rules common to every product.

Frequently asked questions

What is Egypt's CBAM default for cement and clinker?

1.270 tCO2e per tonne for grey clinker, 1.290 for grey Portland cement, 1.330 for white clinker and 1.390 for white Portland cement, before the mark-up.

What mark-up applies to cement defaults?

10% in 2026, 20% in 2027 and 30% from 2028 onwards.

Why does the clinker ratio matter so much under CBAM?

On actual data, the deduction for finished cement comes only from the clinker in it, at 0.666 tCO2e per tonne of clinker for grey cement. A tonne of cement with less clinker has lower emissions and a smaller deduction; the net decides the bill.

Do indirect emissions count for cement?

Yes. Electricity used, mostly for grinding, counts for cement, so renewable power and waste heat recovery can lower the CBAM figure.

How many CBAM certificates does a tonne of Egyptian clinker need?

On the grey clinker default, about 0.75 in 2026, 0.89 in 2027, 1.05 in 2028 and 1.65 from 2034, taking the correction factor at 1.

Send me what you received

If your EU buyer, a verifier or your lender has sent you a CBAM request about cement or clinker, send it to me in five short lines: what you received, from whom, the deadline, your sector, and what you want to know. I'll reply by email.

Send me what you receivedHow engagements run

I don't arrange finance, introduce lenders or work on files for my employer's credit decisions. Every enquiry gets a conflicts check before any work.

Sources

Legal texts (Official Journal of the European Union)

  1. Regulation (EU) 2023/956 establishing a carbon border adjustment mechanism, Articles 6, 8, 10, 20, 21, 22 and Annexes I, II and VI eur-lex.europa.eu
  2. Regulation (EU) 2025/2083 amending Regulation (EU) 2023/956 eur-lex.europa.eu
  3. Commission Implementing Regulation (EU) 2025/2621 on CBAM defaults, Annexes I, II and IV eur-lex.europa.eu
  4. Commission Implementing Regulation (EU) 2026/1740 of 20 July 2026 correcting Annexes I and IV of 2025/2621 eur-lex.europa.eu
  5. Commission Implementing Regulation (EU) 2025/2620 on the free allocation adjustment and CBAM benchmarks eur-lex.europa.eu
  6. Commission Implementing Regulation (EU) 2025/2547 on the methods for calculating embedded emissions eur-lex.europa.eu
  7. Directive (EU) 2023/959 amending Directive 2003/87/EC, Article 10a(1a), CBAM factor eur-lex.europa.eu

European Commission

  1. CBAM legislation and guidance, with the Commission's Excel files of default figures (version of 6 August 2026) and benchmarks (6 February 2026) for the definitive period taxation-customs.ec.europa.eu
  2. Price of CBAM certificates taxation-customs.ec.europa.eu

Trade data

  1. Eurostat Comext, DS-045409, reporter EU, partners Egypt and extra-EU, imports, CN 2523, 2023 to 2025 (dataset updated 16 October 2026, queried 2 November 2026) ec.europa.eu

Reported, not law

  1. EnterpriseAM, "It looks like we might get a break on the EU's carbon tax", 12 January 2026 enterpriseam.com

All views are my own, written in a personal capacity. They do not represent my employer or any other institution. This page explains public rules; it is not legal or tax advice for a specific shipment.